Shield Manufacturing Technologies mezzanine floor

Scope: Design and fit mezzanine floor

Sector: Warehousing

Duration: 3 weeks

Fit Out: CAT B

A mezzanine floor we installed for our client to utilise space in their existing building.

We added 60-minute fire protection, we achieved this by adding a fire rated suspended ceiling installed to the underside of the mezzanine floor, with a fascia to all exposed edges. We installed fire rated column cases.

The new mezzanine floor included:

  • Fire rated suspended ceiling
  • Fire rated column cases
  • Fire rated fascia